WEBSITE OF ELECTRICAL DEPARTMENT ON INTERNET

 

 

ABOUT US:

 

1.

ORGANIZATION

 

Gazetted

 

Sr. DEE (G)

ShriAshok Kumar Verma

 

ADEE(G)

ShriG. D. Nair

 

Non-Gazetted

 

 

 

Description

Sanction

On roll

Vacancy

Train Lighting

210

177

33

General Power Supply

305

283

22

Sr. DEE Office

18

15

03

Total

533

475

58

2.

BRIEF HISTORY

 

 

Solapur Division is a non electrified traction section.Railway electrification work in MMR – DD section is in progress. There are 103 electrified stations from Wadi to Yeola including DD and from MRJ to LURR including KWV.

 

3.

MAJOR ACTIVITIES

 

 

Maintaining continuous and reliable power supply to Railway stations, S&T equipments, PRS and UTS centers.Lighting of Stations and Yards, colonies, water supply to station and colony through pumps. Maintaining electric supply through track crossing of SEB.

 

 

No. of stations electrified

: 105

 

Stations having water coolers

: 17

 

Stations having electrical pumps

: 70

 

Stations having AC Retiring rooms

: 02 (Solapur, Gulbarga)

 

Modern stations

: 01 (Kurduwadi)

 

Model Stations

: 05(SUR, GR, ANG, DD, KPG)

 

Adarsh Stations

: 04( WD, GR, BAP & LUR)

 

Touch & Feel stations

: 05(SUR, GR, ANG, DD, WD)

 

Stations having TL Battery Charging facilities

: 08 (WD, SUR, KWV, DD, LUR, PVR,

UMD & SNSI)

 

Stations having A/C coach pre-cooling arrangements

: 08(WD, SUR, DD, KWV, PVR, LUR,

UMD & SNSI)

 

4.

INFRASTRUCTURE: ELECTRICAL ASSETS

 

4.1

OSM GROUP:

 

 

 

22 KV Sub Stations

: 05

 

11 KV Sub Stations

: 17

 

Electrical Pumps

: 354

 

D.G. Sets

: 28

 

A.C. Units Window Type

: 144

 

A.C. Units Split Type

: 108

 

A.C. Units Package Type

: 04

 

Water coolers

: 133

 

Refrigerators

: 07

 

Transformers

: 60

 

2.1 KVA portable generators

: 128

 

HT Supply (sub-stations)

: 15

 

LT Supply

: 419

 

Standby supply atstations by Generators

: 12 of capacity ranging from 20 to 320 KVA

(WD, SDB, GR, SUR, KWV, PVR,

DD, ANG, LUR, BAP, KPG & SNSI)

:59 stations, 2.1 KVA portable Gensets

provided. (Operated by Optg. Deptt.)

 

At PRS’sby Generators

:4 ( BAP, PVR, LUR, JH)

 

4.2

TRAIN LIGHTING & AC MAINTENANCE

 

 

Holding

Pass. TL coaches

AC coaches

Total

Holding BG

148

15

163

 

Rakes for Primary maintenance:

 

AT SUR :

Mail/Exp. Train Nos : 12115/12116(Siddheshwar Exp)/11011/11012 (Mahalaxmi Exp)

: 12157/12158 (Hutatma Exp)

: 11423/11424 (Bagalkot Exp)

 

AT DAUND :

Passenger Train Nos. : 51339/51340, 51323/51324, 51353/51354.

 

 

Depot

SUR

DD

TOTAL

No. of Rakes / day

2

1

3

No. of AC coaches / day

4

-

4

No. of TL coaches / day

34

19

53

 

Rakes for RBPC maintenance:

 

Mail/Express Train Nos. : 12527/12528 (CSTM-LUR)

 

Passenger Train Nos. : 57649/57650, 51404/51403, 51033/51034,

51035/51036, 51027/51028

 

 

Depot

SNSI

LUR

WD

PVR

TOTAL

No. of Rakes / Day

3

1

1

1+1 tri weekly

6+1 tri weekly

No. of AC coaches / day

6

2

-

-

08

No. of TL coaches / day

29

13

13

7+11 tri weekly

62+11 tri weekly

 

AC COACH MAINTENANCE

 

 

Self generating AC Coaches

 

Depot

Type of AC coach

Holding

Solapur

WGACCW

04

 

WGFACCW

04

 

WGACCN

05

 

WGCZAC

02

 

 

Primary maintenance Trains

 

12115/12116 (Siddheshwar Express), 12157/12158 (Hutatma Express)

 

Station

No. of Rakes

Name of train

No. of AC coaches

Solapur

4

 

Siddeshwar Express/ Mahalaxmi Express

1- WGFACCW ,

1 - WGACCW &

1-WGACCN per rake

 

1

Hutatma Express

1 – WGCZAC

Daund

NIL

NIL

NIL

Wadi

NIL

NIL

NIL

 

RBPC Maintenance

 

Station

Train no.

Name of train

No. of AC coaches

LUR

12527/12528

CTSM-LUR EXP

1- WGACCN,

1- WGFACCW

 

5.

ACHIEVEMENTS:

 

5.1

NON CONVENTIONAL SOURCES OF ENERGY

 

Solar water heaters

: 23 (WD-5, GR-1, SUR-13, DD-3, PB-1)

 

Solar Emergency lights by LED system (Standby)

: 61 Stations

: 49 LC Gates

 

Solar Emergency Street lights

: 33(SUR-21, Bale-6, Rahuri-6)

 

Solar Emergency hand lamps

: 46 (Used by Gatemen)

 

Solar Stud lights

: 12 (Running Room, Solapur)

 

Solar Refrigerator

: 1 (Running Room, Solapur)

 

Solar Home lights

: 4 (Running Room, Solapur)

5.2

REWIRING OF STAFF QUARTERS

 

Total Nos. of Electrified Quarters

: 6660

 

No. of quarters due for rewiring

: 1861 (2010-11)

 

Target of rewiring of quarters

: 1000 (2010-11)

 

Quarters rewired (2010-11)

 

: 634& for 500 Quarterswork is in progress. For balance, workproposed in LAW 2009-10, but not sanctioned.

 

5.3

ENERGY CONSERVATION MEASURES:

· 

10463 CFLs have been distributed in 4467 staff quarters in the Division under CDM project by Railway Board.Physical survey has been carried out by M/s A.C.Nelson, the Auditing Agency nominated by the Railway Board and no deficiency was found during the survey.

· 

25 energy efficient pumps provided in place of old pumps

· 

50 Timers provided to street lights at way side stations in the Division

· 

46 LC Gates provided with solar lanterns as an standby arrangement during SEB power supply failure for Gatemen

· 

2704 energy efficient T-5 fittings provided on platforms & service buildings

 

· 

03 LED signage boards provided in SUR, ANG and AKOR stations

 

· 

543 staff quarters have been re-wired

 

· 

83 old ceiling fans of 90 watt replaced by new energy efficient 60 watt ceiling fans in service buildings

 

· 

492 electronic fan regulators provided in service buildings

 

· 

128 CFLs of 11 watt provided in the Division

 

· 

04 unauthorized connections detected and disconnected

· 

At Solapur, 7.5 Ton Centralised AC units (2 Nos each) of Control Office & Railway Hospital operation theatre have been replaced with total 8 split type, energy efficient 5 star rated AC units

- Reduction in Electrical Energy consumption by 170 units daily besides better cooling effect.

 

· 

Borosilicate type Solar Water heaters provided at Running Room/SUR, Hospital/SUR. Hybrid geyser system commissioned at Solapur, Wadi and Gulbarga to achieve energy efficiency and reliable hot water supply to Running staff.

 

· 

2 Nos split AC units, energy efficient 5 star rated has been provided (in place of old, inefficient window ACs) in Crew booking lobby/ Daund to save 20 units electrical energy consumption daily.

 

· 

Solarisation of Running room/SUR: Solar hybrid geysers, soar refrigerator, solar street light, solar studs, solar footlights, solar home light and solar emergency light have been provided at Running room/SUR. This has resulted in saving of about 70 units per day (Approx 2100 units or Rs 12000 per month).

 

5.4

Electrical Energy Consumption: (with respect to last year)

 

ENERGY CONSUMPTION W.R.T. LAST YEAR

Figures in 000’s units

Annual consumption 2009-10

Consumption April’09 to Jan’10

Consumption April’10 to Jan’11

% increase/ decrease

16353

13785

13578

- 1.50 %

 

6.

Testing Facility:

 

· 

4.5 KW Alternator Testing Machine provided in TL-AC shop Solapur

 

·`

Transformer Oil testing machine at DD, SUR, KWV and WD OSM depots.

 

· 

Breath Analyzer is provided at TL-AC depot, Solapur.

 

· 

V-Belt testing gadget.

 

· 

Water Raising Apparatus for testing water level in AC coaches.

· 

MCB testing equipment, current injector type.

 

· 

OVP Testing Unit.

 

· 

Shock pulse meter and contactless thermometer

 

7.

Staff Welfare Activities:

 

 

Confidence Building Course Training is imparted to the TL-AC staff at Solapur.

 

8.

Contact us:

 

Name

S/Shri

Designation

Telephone Rly

Telephone BSNL

Mobile No.

S.S.MANGAL

SR.DEE/SUR

(014)55150

(0217) 2312661

9766344030

 

G.D.NAIR

ADEE/SUR

(014) 55152

(0217) 2318419

9766344031

 

e-mail -srdeesur.cr@gmail.com , srdee@sur.railnet.gov.in

 

9.

Photographs for Photo gallery

 

Lighting arrangement of pit line at Daund :

Lighting arrangement has been done for 300 meters inside the pit line of Daund by providing 72 Nos. of water proof CFL fittings of 2 x 18 watt, 24 volts and by 6 Nos. of 70W MH fittings outside the pillar poles.This has facilitated the maintenance of 12 coaches.Safety equipments can be checked easily by better illumination during night time from 00.00 to 06.00 hours.Timer has been provided for lighting circuit to control the electric energy consumption. Due to better illumination in pit line, efficiency of staff has increased & pathway has also got better illumination for staff movement.

 

 

Improvement to lighting on platform at Daund :

367 Nos. of indoor T-5 fittings have been provided on PF No.1/4, 2/3, 5/6 to improve the lux level under Touch & Feel work.COP – 35 lux, FOB – 20 lux, below FOB on PF – 22 lux, Gen. Waiting hall – 40 lux, Ist Class waiting hall – 35 lux, Parcel office – 100 lux.

 

 

 

 

 

 

 

 

 


SOLAR WATER HEATER

Solar energy is converted it into thermal energy through Solar water heather of TATA BP make type Borosilicate capacity 200 LPD to tap the solar energy. The internal glass tube is connected with environment friendly and highly absorbing material to heat up the water contained in the glass tube. The heated water becomes less dense than the storage tank and starts rising through the tube due to thermosyphon effect eventually reaching the tank.Simultaneously cold water from the tank descends to the tube and gets heated up in the absorber and raises back to the hot water tank and the cycle repeats.

SOLAR FOOT LIGHT:

Foot light in the bedrooms are required to be kept ON round the clock in all the 4 Bed rooms of Running Room.Foot light of 4 watt powered LED is the only source of illumination in the Bed Rooms for movement of occupants. The TATA BP make home light system is the Solar energy which converted into Electrical Energy through Solar photo voltaic system. There is total saving of energy consumption by 112 watt per day.

SOLAR REFRIGERATOR:

Solar Refrigerator is a concept developed by this Division. At present such solar energy is converted into electrical energy through solar photo voltaic cells and electric energy is stored in the batteries. DC power of the battery is converted into 230 AC through APC make inverter which enables to operate the compressor of the refrigerator.

Due to use of Solar + Electric refrigerator, daily consumption is upto 2.2 units per day contributing to a saving of 1 unit per day.

 

EMERGENCY LIGHTING :

Emergency lighting from Solar power back of TATA BP model is 160 watts, battery 110 AH, 24 volts charge controller 24 volts, 10 Amp inverter 800 VA.The power drawn here also from the Solar itself through Solar photo voltaic system and fed to emergency light of kitchen, dinning hall, corridor, lavatories etc.Whenever power fails, the power pack becomes effective to feed on this emergency system.

 

 

 

 

 

 

10.

Innovations

1.

An indepth study of functioning of centralized AC plants was done with respect to energy consumption, cost effectiveness vis-à-vis its cooling effect. It was found that as compared to the cooling effect, energy consumption is much more. In this back ground, it was decided to replace these centralized AC plants with 8 Nos of stand alone AC units in Control Officer and Railway Hospital, Solapur. After installation of these stand alone 5 star rated energy efficient split AC units there is a saving of 170 units per day as under:

 

Old centralized AC unit daily consumption

Stand alone split AC daily consumption

Stand alone 5 star rated split AC -

Daily units saved

Daily amount saved

Monthly units saved

Monthly amount

Saved

Yearly units saved

Yearly amount saved

230 units

60 units

170

units

Rs.1215/-

5100 units

Rs.36,465/-

61200 units

Rs.4,37,580/-

 

Total cost of 8 split AC units of 1 ton capacity (procured through DMM/SUR and installation work done departmentally) is Rs. 1,80,000/- (Rs.22,500/- each).

Rate of return (ROR) is 150 days (5 months).

1.5 ton window type AC (old and inefficient) have been replaced by 1.5 Ton, split type 5 star rated, energy efficient AC units at Crew Lobby, Daund, thereby saving of 20 units daily and 600 units in a month. In monetary terms there is a saving ofRs. 4,290/- per month and yearly saving of Rs.51,480/- will be achieved.

 

Old Window type AC

Stand alone split AC daily consumption

Stand alone 5 star rated split AC -

Daily units saved

Daily amount saved

Monthly units saved

Monthly amount

saved

Yearly units saved

Yearly amount saved

96 units

76 units

20

units

Rs.143/-

600 units

Rs.4,290/-

7200 units

Rs 51,480/-

Total cost of 2 split AC units of 1.5 ton capacity (procured through DMM/SUR and installation work done departmentally) is Rs. 62,474/- (Rs.31,237/- each).

Rate of return (ROR) is 437 days (15 months).

2.

Solarisation of Running room/ SUR, consisting of borosillicate type solar water heater

with hybrid geyser system, solar home light, solar refrigerator, solar foot lights, solar

stud lights, solar street lights, solar glow sign board and solar emergency light has been

completed. This has resulted in power saving of approximately 70 units per day.

 

Previous daily consumption of RR.

Daily consumption after solarisation

After solarisation

Daily units saved

Daily amount saved

Monthly units saved

Monthly amount

Saved

Yearly units saved

Yearly amount saved

200 units

130 units

70

units

Rs.500/-

2100 units

Rs.15,015/-

25200 units

Rs.1,80,180/-

 

(All these items were procured through DMM/SUR and installation work done departmentally) Total cost of solarisation is Rs. 2,63,340/- as under:

 

Sr.

No.

Item description

Quantity

Rate

Total Amount

1.

Solarl Street light

2

Rs.25,170/-

Rs.50,340/-

2.

Solar power pack

1

Rs.72,000/-

Rs.72,000/-

3.

Solar home light/foot light

4

Rs.13,000/-

Rs.52,000/-

4.

Solar refrigerator

1

Rs.89,000/-

Rs.89,000/-

 

 

 

Total

Rs.2,63,340/-

 

Rate of return (ROR) is 527 days (17 months).

 

3.

Water supply to Gangapur road railway station is provided through Bore well erected at about One Km from Railway Station area. A submersible pump is provided to this bore which was hitherto operated by Station staff.Lot of difficulties were experienced in operating this pump as staff had to be deputed for switching OFF/ON whenever water was to be pumped.Since the pump is situated far away from the station, many a times water use to over flow.During power failures staff had to repeatedly shuttle from bore well area to station leading to wastage of man power, wastage of electricity as well as water due to over flow.

To overcome the above problems, an innovative idea of controlling operation of pump through KHYATEE MOBILE STARTER/AUTO SWITCH from SM’s office was explored and found successful. Now operation of pump is done from SM’s office through mobile from 16.01.2011.This has not only saved man power utilization by 2 hours daily but also eliminated wastage of power as well as water.Salient features of automation of this submersible pump is as under:

 

1)Operated on Micro Controller based software technology.

2)Inbuilt universal mobile charger.

3)Pass word protection

4)User friendly operation, every number of mobile has specific operation/feature which works on IVRC.

5)Has inbuilt sensor for protection from phase failure, reverse phase failure, voltage fluctuation, ‘ON’ delay timer etc.

 

 

 

11ELECTRICAL GENERAL SERVICES DETAILS OF SOLAPUR DIVISION

GIVEN IN INDIAN RAILWAY MAGAZINE FOR JANUARY 2011 VOL. 57 No. 10

 

*Solapur Division is a non electrified traction Division of Central Railway. Division is facing the daunting task of ensuring reliable power supply to Stations, LC Gates, Signal equipments etc under the shadow of extensive power cuts. Almost entire stretch of Solapur Division is reeling under the power cuts ranging from 06 to 15 hrs a day.The Electrical Branch of the Division has to explore all means to ensure reliable power supply like availing dedicated express feeder/ Industrial/ Urban Feeder supply from the Electricity Boards. With all these constraints, services like primary and secondary electrical maintenance of all the train lighting and air conditioningcoaches, electrification of LC gates, signaling equipments, illumination of circulating area, Goods sheds, stations, passenger amenities etc. are being maintained by providing high masts, installing DG sets,UPS to PRS and UTS locations.

 

*Solapur Division is having connected load of 14941 KW and yearly consumption of 16.353 million units.

 

*This Division is maintaining 11 primary rakes and 11 secondary rakes with 148 TL coaches and 15 Nos. of AC coaches.

 

*This Division is having 6649 numbers of Electrified Staff quarters and all quarters are rewired except 1100 Nos. 350 Nos. of Pumps are feeding water supply to station and colony.

 

*21 HT (22 KV and 11 KV) substations are in service to ensure improved and reliable power supply to Railway activities in Solapur Division and 345 nos. of L.T connections spread over 3 SEB authorities i.e. MSEDCL, MPECS (Maharastra) and GESCOM (Karnataka).

 

*Dedicated HT (11 KV) express feeder supply has been availed at SUR station to make NIL load shedding to ER shop sub station.

 

*For augmentation of power supply more reliable feeder commissioned by providing separate 63 KVA transformer at 28 stations.

 

Passenger Amenities & Traffic Facilities:

 

*All the ‘A category and Model stations have high standard of illumination including Retiring Rooms, Running Rooms, Stations, Platforms, Goods Sheds and circulating areas. For the comfort of passengers and staff a total of 252 AC units, 26 DG sets, 128 water coolers, 21 centralised air coolers, 43 high masts have been provided.

 

*At Solapur I Class Waiting Room has been Air Conditioned.

 

*Centralised Air Cooling system has been provided in Queuing area of PRS and in Booking office, Solapur.

 

*Circulating area of A, B & D category stations have been provided with High Mast Lighting.

 

*Daund and Wadi Yards have been illuminated with 1 x 70 watt Metal Helide lighting for freight train examination.

 

*PF No.1 & 2/3 of Solapur, Gulbarga and PF No. 1 & 2 at Ahmednagar have been provided with auto platform lighting system working on infra red sensor with pre-programmed train timing.Light intensity sensor has been provided along with this unit on PF No.1 &2/3 each.Electric energy is saved due to auto ON/OFF platform light as previously switching was being done by Operating Department. T-5 fitting provided for illumination on PFs and is controlled by this auto sensor switch.

 

Staff Amenities:

 

*Centralised air cooling system has been done in Running Rooms of Wadi, Solapur, Puntamba and in Lobbies at Solapur & Wadi and in Divisional Railway HospitalSolapur..At Daund and Puntamba Lobbies, AC units have been provided.In summer, since ambient temperature goes upto 46ºC, temperature inside the room can be brought to relatively comfortable level by air cooling system.

 

*Lighting arrangement has been done for 300 meters inside the pit line of Solapur by providing 85 Nos. of water proof CFL fittings of 2 x 18 watt, 24 volts. This has facilitated the maintenance of rake of Siddeshwar Express and other trains. Safety equipments can be checked easily by better illumination during night time from 00.00 to 06.00 hours.Due to better illumination in pit line, efficiency of staff has increased & pathway has also gets better illumination for staff movement

 

Energy Conservation:

 

*Energy efficient lighting through CFL in Indian Railway’s house holds under Clean Development Mechanism based CFL project, Solapur Division has distributed 10,505 CFLs in staff quarters. Railway Board has nominated Solapur Division for energy auditing by M/s A.C. Nielsen appointed by C-Quest Capital (CQC).

 

*While ensuring adequate power supply, energy conservation is the first priority in its agenda, Electrical Branch of Solapur Division has provided as many as 22 Solar water heaters at Running Rooms and Retiring Rooms, 93 Solar LED lights at stations and LC Gates, rewiring of around 1200 Railway quarters, provision of around 3200 T-5 fittings, 46 timers for street lights and high masts, 2000 electronic regulators, etc.Switching ‘On/Off’ of 70% and 30% circuits have been provided and being operated at platforms lights, high masts etc. and are being ensured by Electrical Department.

 

 

Improvement of lighting at Wadi yard.

High Mast Lighting at Hotgi

 

Illuminated Station building of Solapur

Improvement of PRS/Gulbarga.

 

Electrification of L.C. Gate No.30 by hybrid system consisting of Solar & Wind Mill

Illumination in Circulating area at Belapur Station:

 


 


 

Improvement of lighting at Wadi yard.

To illuminate entire Wadi yard from A cabin to E cabin through6 towers, 8 metal halide fittings have been provided on each tower (2x400 watt – 6 Nos., flood light type, 1x400 watt – 2 Nos. asymmetrical beam type).Lux level improvement from 3 lux to 20 lux has been achieved to give better night working condition.

 

 

Centralised air cooling in the Running Room at Wadi.

 

Centralised air cooling has been done in 11 rooms of LPs, ALPs & Guards at the Running Room Wadi with 4 openings in big hall and 2 openings in small rooms.In summer, ambient temperature goes upto 46ºC, by air cooling; temperature inside the room can be brought to 31ºC to give increased comfort to the occupants.

 

 

 

Automation of platform lights at Gulbarga.

 

PF No.1 & 2/3 have been provided with auto platform lighting system working on infra red sensor with pre-programmed train timing.Light intensity sensor has been provided alongwith this unit on PF No.1 & 2/3 each.Electric energy is saved due to auto ON/OFF platform light as previously switching was being done byOperating Department. T-5 fitting provided for illumination on PF No.1 is 130 Nos. and on 2/3 is 112 Nos. is controlled by this auto sensor switch.

 

Improvement of lighting at either side of gate.

 

For adequate lighting in LC Gates for the road users 2 outdoor type fitting with electronic choke in 80 gates have been provided to illuminate either side of the gate lodge.One ceiling fan/wall bracket fan has also been provided in the Gate lodge for the use of Gateman.

 

 

 

(†¿ÖÖêú ãú´ÖÖ¸ü ¾Ö´ÖÖÔ )

¾Ö׸üšü ´ÖÓ›ü»Ö ×¾ÖªãŸÖ ‡Ó•Öß×­ÖµÖ¸ü

ÃÖÖê»ÖÖ¯Öã¸ü




Source : Central Railway / Indian Railways Portal CMS Team Last Reviewed on: 17-08-2011  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2010  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.