68 Stations Targeted for March,2019
 
Select Zone
Select Division
Select Station
Download in Excel Format
S. No. Railway Division Station Description
of Work
No. of Tenders
to be invited
Dates of
tender invited
Dates of Work
Awarded & TDC
Summarised
Progress of Work
Physical
Progress (%)
Remarks Updated on Files Station Illumination(Night) Miscellaneous
1 CR Bhusawal Burhanpur (a)Provision of 3.66 m wide additional FOB at BSL end b) Provision of COP on Up PF ( 112 x 10.5 M) , on DN PF ( 144 x 8.5 M).c) Improvement to station facade , Provision of Entrance gate and separate parking with Drop and Go facility. (d)Improvement to UP/DN PF surface with side walls. e) New station building with Retiring room 02 Nos. and VIP lounge with cafeteria to match the aesthetic importance of city, f) Improvement in Lighting arrangement in circulating area. g) New furniture for Booking office, reservation office, retiring rooms, waiting rooms,VIP lounge and four seater steel benches & dustbins (Dry & wet) for platforms. h) Passenger information boards, Theme based Painting at various places as per local historical values. i) Replacement of Non RDSO Coach Guidance System with RDSO Type coach guidance system, Facade lighting / passenger amenities item and standby power supply arrangement. 2 26/06/18, 26/06/18 06/08/18, 13/08/18 work in progress 5 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






2 CR Pune Pune a) Improvement to Station Facade and lighting . b) Replacement of false ceiling, flooring, Doors & windows in Retiring rooms c) Improvement to Dormitory including SM, SS, DYSS Rooms etc. d) Painting with textured Interior paints to station building, Renovation/construction to Pay and use Toilet on PF No.1 , PRS & second entry side. e) Improvement/Renovation to flooring in front of booking office at ground Floor near main Porch including Booking window. f) Renovation of existing cables of circulating area by providing cable tray, LT distribution panel boards, feeder pillar, outdoor type meter box, new cable laying trenching etc. ,including S&T cables. g) Provision of seating arrangement at platform, LED signages as per requirement, h) Development of selfie point/beautification, murals & painting i)Improvement/Renovation to surface of PF No 1, 2/3 and PF No.4/5 2 12/10/18 13/10/18 , 15/11/18 1.Toilet work started on 2nd entry. 2. Design of canopy being done. 15 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






3 CR Solapur Solapur a) Improvement to station Fecade and circulating area. b) Shifting of existing parking area. c) Development of garden, Garbage pickup and disposal , procuring steel dustbins. d) Improvement of retiring room and toilets. e) Drinking water arrangements, Water vending machines and water ATMs on platforms. f) Improvement to -Waiting hall booking areas and concourse, Modular catering Kiosk (work will be carried out as per Architectural design),Standard Modular signage etc for Divyangajan and information board. g) Stainless steel benches. h) Platform surface improvement by heavy duty Chequred tiles in platform coping and providing vaccum dewatered concrete and Lift /Escalator on P/F No. 4/5 i) Provision of new FOB 6.0m wide with escalator at DD end at Solapur and extension of exiting FOB(PA end) by 31.70 M at DD station 2 10/06/18 28/08/18, 05/10/18 Renovation of retiring room completed and handed over. Concreting of circulating area in front of PRS in progress. FOB re-roofing work in progress 50 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






4 CR Nagpur Wardha a) Improvement to building façade. b) Improvement to circulating area, provision of drop and go facility, auto lane, entrance gate and landscaping/gardening etc c) Shifting of GRP office, shifting of booking office with 10 counters, queuing area, waiting hall, store room, cash room, CBS room, toilet facility for ladies and gents , changing room for ladies , CI office, coolies room etc. d) Development of circulating area with relocation of existing structure e) Provision of proflex sheet shed on home platform. f) Provision of AC waiting room in old cash office. g) Garbage pickup and disposal dustbins. h) Improvement to waiting rooms (ladies and Gents), VIP rooms, toilet blocks and platform surface. i)Provision of new 6.00 M wide FOB with Lifts j)Provision of COP 2 05/07/18 27/08/18, 10/09/18 Work in progress 10 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






5 CR Mumbai Igatpuri a) Improvement of Station facade,Provision of COP on balance portion of platforms, provision of toilet blocks, circulating area, improvement of Pay and Park sites. b) Provision of 02 High mast lighting towers, c) Improvement of lighting facility, ventilation system and signages. 1 19/09/18 05/10/18 Work of COP , toilet blocks, station facade and circulating area is in progress. 10 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






6 ECOR Sambalpur Division Sambalpur FOB with escaltor and ramp, Extension of FOB, Improvement to waiting hall,waiting rooms,retiring rooms,improved toilet facilities and Provision of Coach and Train Indication board, Lifts, Divyangjan friendly facility, etc New FOB with ramp & escaltor - work in progress Facade improvement- Work in progress with ACP WORK IN PROGRESS 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






7 ECR Danapur Patliputra 1. Improvement to the facade of the station building of patliputra station. 2. Provision of 20 feet wide additional FOB at Patliputra station of Danapur Division. 3. Extension of existing FOB at Patliputra. 4. Improvement of circulating area of Patliputra station. 5. Improvement of platform surface at Patliputra station. 6. Provision of Washable apron on Platform no. 2 at Patliputra station. 7. Improvement of SS/Dy SS Room at Patliputra station 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






8 ECR Danapur Patna Jn. 1.Improvement of facade of station. 2. Improvement of circulating area. 3. Improvement of platform of station. 4. Improvement of SS/Dy. SS room 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






9 ER Howrah Howrah Howrah 1 19/11/2018 19/11/2018 Howrah 90 Howrah 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






10 NCR Agra Division Mathura Jn Soft upgradation of Mathura Jn. Station by improvement to façade, circulating area, development of new entryexit, platform surface & booking hall etc. 1 18.06.18 14.08.18 50 % 50 % Work is in progress TDC: 31.03.19 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






11 CR Mumbai LONAVALA-LNL a) Construction of Station Fecade and Improvement of Booking office at market side b) Improvement of circulating area and parking area on market side, c) Cover over Platform on PF 2/3 at both ends, d) Improvement of waiting hall, SM office etc. e) Provision of garbage bin. f)Replacement of Old CSMT end FOB ( 3.66 M wide with new 6 M wide) g)Resurfacing of PF No. 2/3. 3 14/05/18 27/09/18,27/09/18, 12/10/18 a)   Improvement of Booking office , circulating area, parking area , and Cover over Platform 2/3 is in progress. b)Dismantling of old FOB and fabrication of plate girder of new FOB is in progress. 10 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






12 SCR Secunderabad WARANGAL Improvements to Station Facade, concourse area, Booking Office, Streamlining traffic flow in circulating area, COP, PF flooring, Waiting halls, Retiring Rooms, Land Scaping, Indication Boards and other passenger amenities. 9 15-06-18 (2 Nos), 09-07-18 (2 Nos), 12-08-18, 23-08-18 (3 Nos) & 18-10-18. i) Tenders awarded on 29-08-18, 12-09-18, 04-09-18, 07-09-18, 25-09-18, 10-10-18 (2 Nos.) & 30-10-18. ii) Tender to be opened on 19-11-18. WORKS IN PROGRESS a) Extn. of Circulating area on West side - 5000sqm. b) Provision of COP on PF No.4 - 14 spans Foundation work. c) Extn. of FOB from PF 2&3 to PF 4 - Foundation work. d) Platform 1 to 4 surface improvements. e) Improvements to Booking area & Concourse. f) PF 2&3 Pay & Use Toilet renovation. g) Repairs to Boundary wall on west side. 30 i) Redevelopment works costing Rs.13.04 Cr. sanctioned for Warangal station. ii) An outlay of Rs.9.68 Cr. is distributed under PB 724 - Allocation: Capital, for redevelopment of Warangal station. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






13 SCR Vijaywada VIJAYWADA Provision of COP, Improvements to Toilets, Urinals, Retiring rooms, booking counters and Façade, façade lighting, water tanks, COP roofs, CIBs & TIBs, Circulating area, Traffic flow pattern & Divyangjan facilities. 5 09-05-18, 23-05-18, 10-05-18, 04-07-18 & 24-08-18. 04-09-18, 08-10-18, 05-10-18, 01-10-18 (2 Nos). WORKS IN PROGRESS: a) COP foundation work in PF Nos. 2&3, 4&5. b) FOB from PF 1 to 10 foundation work. c) Improvements to Retiring rooms, PF suraface & circulating area. 20% i) Redevelopment works costing Rs.14.38 Cr. sanctioned for Vijayawada station. ii) An outlay of Rs.10.67 Cr. is distributed under PB 724 - Allocation: Capital, for redevelopment of Vijayawada station. 18/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






14 SCR Guntakal GUNTAKAL JN. Improvements to Waiting halls, Circulating area, Parking, Divyangjan facilities, Water supply arrangements, Toilets, lighting at circulating area, waiting halls, retiring rooms, etc., CCTVs, Clocks and Beautification of station. 4 07-08-18, 23-08-18. a) 1 Tender awarded on 25-09-18. b) 1 Tender opened on 31-10-18 and under finalisation. c) S&T Tender opened on 05-10-18 and under finalisation. d) Electrical tender to be opened on 24-11-18. WORKS COMPLETED: a) New station building. b) Traffic flow pattern. c) Circulating area & Approach road to station. WORKS IN PROGRESS: a) Fountain work in circulating area. b) Façade improvement work. c) Circulating area improvements. 20% i) Redevelopment works costing Rs.9.94 Cr. sanctioned for Guntakal station. ii) An outlay of Rs.3.66 Cr. is distributed under PB 724 - Allocation: Capital, for redevelopment of Guntakal station. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






15 NER Lucknow Gorakhpur Jn. At Gorakhpur- Redevelopment of railway station phase 1 cost 10.75 Crore. 4 Elect. works on 28.09.18, Civil Engg. on 05.10.18 & on 11.10.18 & S&T works on 11.10.18. - Works sanctioned under umbrella work, completed work and work in progress, List is attached. 0 Works sanctioned under umbrella work, completed work and work in progress, List is attached. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






16 NER Izzatnagar Izzatnagar IZN Division ? Augmentation of passenger amenities at IZN Cost Rs. 9.40 Cr. 3 18 July 2018 - Tender will be opened on 28.08.2018. 0 Work completed and works in progress, List is attached. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






17 NFR Alipuduar Alipurduar Junction At Alipurduar Jn: Redevelopment of station - Soft upgrades improvement at stations (Provision of New Station Building). This work consists of the following item: 1) Construction of New "A" class Station Building and landscaping and other ancillary and finishing works. 01 22.08.2018 with date of opeing 14.09.2018 Tender finalized and acceptance issued on 12.10.18. Construction of new "A" class Station Building - Site preperation and foundation work are in progress 5% All drawings are finalized agency has taken up the works of Station beautification along with foundation of New Station Building. TDC of work is 31.03.2019. 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






18 NR Ambala Ambala Cantt. Jn. 1. Construction of deluxe toilet. 2. Provision of false celling under PF-1 shelter. 3. Introduction of laning system in circulation area. 4. Replacement of pavers of SRE end pathway. 5. Renovation of water booths. 6. Covering of drains between line no. 5 & 6, 7 & 8. 7. Repair to Kota stone flooring at PF no. 1 & 1A. 8. Provision of paintings in waiting halls. Completed works are following:- 1. Renovation of water booths. 2. Replacement of pavers of SRE end pathway. 50% Work in progress and target date is 31.12.2018. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






19 SCR Guntur GUNTUR JN. Provision of Passenger friendly concourse,Improvements to Traffic flow pattern facilities, COP,Provision of Granite flooring, drinking water facilities, eco-friendly self paid wash rooms, Divyangjan toilet facilities, Multi Level Parking, CIBs and improvements to Platform ceiling, Retiring rooms, Dormitories, station lighting and Passenger amenities. 5 16-07-18, 09-08-18 (2 Nos), 03-09-18 & 10-09-18. a) 3 Tenders awarded on 19-09-18, 20-09-18 & 25-10-18. b) S&T tender opened on 05-10-18 and under finalisation. c) Electrical tender estimate under preparation. WORKS IN PROGRESS: a) Extn. of COP on PF No.1 - 2 spans - Foundation work. b) Dismantling of SSE/Works & SSE/S&T offices to improve circulating area and construction of new station building on west side. c) Improvements to Retiring rooms on PF 1. 20% i) Redevelopment works costing Rs.11.25 Cr. sanctioned for Guntur station. ii) An outlay of Rs.8.35 Cr. is distributed under PB 724 - Allocation: Capital, for redevelopment of Guntur station. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






20 SCR Hyderabad KURNOOL TOWN Improvements to station building, Circulating area, station entrance, Parking area facilities, Traffic flow facilities, Facelift to front elevation, Entrance Arch, Space Deck Portico for entrance, Drainage system Electrical and S&T arrangements. 4 10-05-18, 22-06-18 & 16-07-18 (2 Nos). a) 2 Tenders awarded on 05-09-18. b) S&T: 18-09-18. c) Electrical: 10-09-18. WORKS IN PROGRESS: a) Relocation of RMS building, Electrical Sub-station & Overhead Tank to improve circulating area, Extn. of station building and façade. 20% i) Redevelopment works costing Rs.14.99 Cr. sanctioned for Kurnool Town station. ii) An outlay of Rs.11.12 Cr. is distributed under PB 724 - Allocation: Capital, for redevelopment of Kurnool Town station. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






21 ECOR Waltair Division Visakhapatnam 1) Improvement of front façade of station building 2) Improvement of waiting halls 3) Improvement of PF floorings with granite floor on PF No.1 & 8. 4) Provision of roof for subway of walkers. 5) Provision of selfie point 6) Provision of stainless steel water pedestals. 7) Provision of modernised clock room. 8) Provision of Modular vending kiosks 9) Provision of RCC slab tiles at coping stone area on PFs.1 & 8 with 1.125 wide strip area. 02 DT.30/08/2018 for a phase-I on 25/09/2018. 02) Dt.10/09.2018 (Consultancy tender has been floated.) As a phase-II. Re-development of VSKP Rly stn. Phase-II tender opening on 11/10/2018 16-10-2018. Phase 1 31-10-2018. Phase 2 31 Estimate sanctioned. Tender phase-I awarded. A.l No.8214/WAT/HQ/18-19/Redevlopment Phse-I/Estate-I/RDC, dt.16.10.2018. & Tender for phase II awarded Al No.8215/WAT/HQ/18-19/Redevelopment works Phase-II/Estate-I/RDC, dt.31.10.2018. 5% (I) Construction of Cloak Room at PF No.8 1. Before Layout Dismantling of Abandoned sheds 2. Column foundation earth work (II) Provision of Additional Retiring Rooms:- 1. Converting of CTI office to Retiring Rooms 2.Converting Catering room to Retiring Room (III) Granite Flooring over PF No.1 at 2nd Entry:- 1. BEFORE DISMANTLING THE CHEQUERED TILES 2.While Dismantling the chequered tiles for Granite flooring 3.While Dismantling the chequered tiles for Granite flooring 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






22 ECOR Khurda Road Division Cuttack 1. Improvement to Façade of station Building, 2. Improvement to circulating area, 3. Systematic collection and removal of garbage, 4. Improvement to existing waiting halls, waiting rooms, Retiring rooms 5. Improved toilet facilities 6. Drinking water arrangements, 7. Improvement to SS/SM/Dy. SS rooms, 8. Improvement to booking areas and entry concourses 9. Selfe-points, Jingles, LED lighting, 10. Standard modular signages etc for Divyangjan. 4 w Engg.works tender (1) 24/08/2018. S&T works (2) tender:- 18/09/2018, stores tender (1) 14.09.2018 Elect.works tender (1); 03/08/2018, stores tender (8) 09.09.2018 & 14.09.2018 Mech. Stores tender (2) :- 14.09.2018 Medical stores tender (2): 12.09.2018 Commercial stores tender (1):14.09.2018 Engg.works tender(1)01/10/2018,S&T works(2) Tender opened 22.10.2018, stores tender(1) P.O. issued. Elect.works tender(1) 17/09/2018,stores tender(8)-P.O issued, Mech. Stores tender(2):Open on 01.11.2018 Medical stores tender(2)-P.O issued,Commercial stores tender(1)-SPC approved. 1. Engg work started 2. S&T tender opened on 22.10.2018, P.O issued. 3. Electrical works tender awarded on 17/09/2018, P.O issued and material recived for 3 nos of stores tender. 4. Mechanical:-Tender opening date 01.11.2018 5. Medical:- P.O issued 6. Commercial:- SPC approved 15 % Total there are 6 department works involved for a cost of Rs 9.92 crores. Outlay for 2018-19 in Cap is 9 Crore. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






23 NR Moradabad Haridwar Improvement to facade, circulating area, creation of selfie/ meeting points, providing new shiv murti, boundary wall, refreshment rooms & retiring rooms improvement, provision of A.C. paid executive lounge, facilities of Divyangjan, additional platform shelters on pf no 6/7, 8/9, platform surface improvement and renovation of various offices etc are scope of this work. 4 Estimates under accounts vetting - - - Plans under approval at Division level. 4 nos Estimates under accounts vetting. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






24 NR Moradabad Dehradun Improvement to facade of station, creation of selfie and meeting points, cloak room renovation, platform surface and water booths improvement, and replacement of AC sheets with meta clolour sheets of PLatform shelters, AC paid executive lounge, provision of toilets for female staff, improvement to waiting halls, offices, Concourse, walkway for Divyangjan etc. are included in the scope of work. 3 3 nos estt under acounts vetting - - - Draft plans prepared. Under approval in Division. 3 nos Estimate under vetting. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






25 ECR Sonepur Sonepur 1. Improvement façade of the station building. 2. Improvement to circulating areas duly streamlining the traffic flow. Circulating area should be redeveloped to provide will regulated lanes for pick up /drop, private vehicles like car/motor bikes, cycle, passenger and staff parking, exit lanes. 3. Platform surface home end platform the centre 100 meter or so to be granite stone (flame burnt) and other areas to be vacuum Dewatered concrete. 4. Washable apron to improve sanitation, if required. 5. Systematic collection and removable of garbage. Suitably located steel dustbins shall be provided ensuring garbage pickup and disposal system. 6. Improvement to existing waiting halls, waiting rooms. Retiring rooms, improved toilets facilities, drinking water arrangements etc to be provided in waiting halls, provision of modular water kiosks and water ATMs. Availability of potable water at all times across the platform length shall be provided. 7. Paid executive lounge with refreshments may be 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






26 ECR Samastipur Bapudham motihari 1. Improvement façade of the station building. 2. Improvement to circulating areas duly streamlining the traffic flow. Circulating area should be redeveloped to provide will regulated lanes for pick up /drop, private vehicles like car/motor bikes, cycle, passenger and staff parking, exit lanes. 3. Platform surface home end platform the centre 100 meter or so to be granite stone (flame burnt) and other areas to be vacuum Dewatered concrete. 4. Washable apron to improve sanitation, if required. 5. Systematic collection and removable of garbage. Suitably located steel dustbins shall be provided ensuring garbage pickup and disposal system. 6. Improvement to existing waiting halls, waiting rooms. Retiring rooms, improved toilets facilities, drinking water arrangements etc to be provided in waiting halls, provision of modular water kiosks and water ATMs. Availability of potable water at all times across the platform length shall be provided. 7. Paid executive lounge with refreshments may be 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






27 ECR Mugalsarai Mughalsarai Jn. 1. Improvement façade of the station building. 2. Improvement to circulating areas duly streamlining the traffic flow. Circulating area should be redeveloped to provide will regulated lanes for pick up /drop, private vehicles like car/motor bikes, cycle, passenger and staff parking, exit lanes. 3. Platform surface home end platform the centre 100 meter or so to be granite stone (flame burnt) and other areas to be vacuum Dewatered concrete. 4. Washable apron to improve sanitation, if required. 5. Systematic collection and removable of garbage. Suitably located steel dustbins shall be provided ensuring garbage pickup and disposal system. 6. Improvement to existing waiting halls, waiting rooms. Retiring rooms, improved toilets facilities, drinking water arrangements etc to be provided in waiting halls, provision of modular water kiosks and water ATMs. Availability of potable water at all times across the platform length shall be provided. 7. Paid executive lounge with refreshments may be 31/08/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






28 ECR Sonepur Hajipur Jn. 1. Improvement façade of the station building. 2. Improvement to circulating areas duly streamlining the traffic flow. Circulating area should be redeveloped to provide will regulated lanes for pick up /drop, private vehicles like car/motor bikes, cycle, passenger and staff parking, exit lanes. 3. Platform surface home end platform the centre 100 meter or so to be granite stone (flame burnt) and other areas to be vacuum Dewatered concrete. 4. Washable apron to improve sanitation, if required. 5. Systematic collection and removable of garbage. Suitably located steel dustbins shall be provided ensuring garbage pickup and disposal system. 6. Improvement to existing waiting halls, waiting rooms. Retiring rooms, improved toilets facilities, drinking water arrangements etc to be provided in waiting halls, provision of modular water kiosks and water ATMs. Availability of potable water at all times across the platform length shall be provided. 7. Paid executive lounge with refreshments may be 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






29 SR Salem Salem jn Redevelopment of Salem station with facilities such as modified PF Shelter in PF.No.3,4,5 & Second entry building, LED display board, sewage plant, solar panel, WA in PF.2 etc. 5 -- -- Plan/Scheme approved. Estimate under process. -- 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






30 SR Thiruvanthapuram Kottayam Redevelopment of Kottayam Station. 6 -- -- Estimate under process. -- Tenders will be called by 2nd week of September''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''18 pending Estimate sanction. 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






31 SWR Bangalore Yesvantpur Improvements to facade, circulating area, PF surface, booking area, Waiting rooms etc., at Yeshwantpur station 11 20.06.2018 17.10.18 Tender awarded for all works and LOA has been issued. 0 Consultant finalized. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






32 SWR Hubli Dharwad Development of circulating area with connecting roads, provision of new station building, FOB & landscaping, PF surface, etc., at Dharward under redevelopment of station. 4 13.08.18 & 24.08.18 30.10.18 & 09.11.18 Tender for Main work is awarded on 09.11.18. Structural drawing is under preparation. work will be started after approval of drawing. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






33 ECR Dhanbad Barkakana 1. Improvement façade of the station building. 2. Improvement to circulating areas duly streamlining the traffic flow. Circulating area should be redeveloped to provide will regulated lanes for pick up /drop, private vehicles like car/motor bikes, cycle, passenger and staff parking, exit lanes. 3. Platform surface home end platform the centre 100 meter or so to be granite stone (flame burnt) and other areas to be vacuum Dewatered concrete. 4. Washable apron to improve sanitation, if required. 5. Systematic collection and removable of garbage. Suitably located steel dustbins shall be provided ensuring garbage pickup and disposal system. 6. Improvement to existing waiting halls, waiting rooms. Retiring rooms, improved toilets facilities, drinking water arrangements etc to be provided in waiting halls, provision of modular water kiosks and water ATMs. Availability of potable water at all times across the platform length shall be provided. 7. Paid executive lounge with refreshments may be 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






34 NCR Allahabad Division Allahabad (i)Construction of new FOB at Allahabad. (ii) Improvement to circulating area. (iii) Construction of boundary wall. (iv) Provision of lift. (v) Provision of Skywalk. (vi) Paint my station. (i)Construction of new FOB at Allahabad. (ii) Improvement to circulating area. (iii) Construction of boundary wall. (iv) Provision of lift. (v) Provision of Skywalk. (vi) Paint my station. Work in progress. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






35 NCR Jhansi Division Jhansi i. New Ramp for passengers at PF No.1 to access the FOB (South end). ii. Ladies changing cum feeding room provided at Upper class ladies waiting hall at PF-1. iii. Old stairs steps at PF 2/3 of mosaic tiles broken & unsafe for users, replaced by granite flooring (40 mm thick) to ensure long life & aesthetic looks. iv. TTE lobby appearance improved with new wall plaster & flooring with vitrified tile, also new counter with granite top provided. v. Floor of PF 2/3 of kota stone damaged at many places causing inconvenient to passenger. Now changed by granite floor for better finish. vi. Old & damaged Kota stone replaced to provide smooth surface at PF 5. Work in progress 65% These works will be completed by Feb-19 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






36 NFR Lumding GUWAHATI At Guwahati: Re-development of station-Soft upgrades improvement at station. This work consists of following items: 1) Improvement of circulating area duly streamlining the traffic flow. Circulating area redeveloped to provide well regulated lanes for pick up/ drop porch. 2) A 3.5 m wide Covered Walk way for passengers right from public bus stand to pickup and drop porch. 3) Seperate parking for private vehicles like car/motor bikes cycles, passengers and staff parking. 4) Provision of 12 new retiring rooms. Work already started. 5) Improvements to booking and concourse area by granite flooring, work in progress. 6) Provision of granite surface in PF-01. 7) Improvements to existing toilets, ceiling of waiting halls (7 nos.) and retiring rooms (9 nos.). 8. Newly design water vats for passengers in all platforms. 9. Provision of 19 number Octagonal Platform benches in PP shed columns. 10. Provision of International Tourist bureau. 11. Granite flooring in concourse area etc. 01 09.07.2018 with date of opening on 13.08.2018 31.08.18 Work of renovation of 3 nos. retiring room & 2 no. waiting hall are completed and 9 nos. retiring room- work in progress. FOB Sraircase has been provided with ACP and false ceiling., entrances at KYQ end FOB completed. 4 nos. model showing local culture has been installed at concourse and 3 nos. mural fixed in councourse wall. Improvement to booking and concourse area by granite flooring - work in progress. Painting in concourse has also been done. 1no. lift at platform 2-3 is completed and commisioned. 23% Apart from the above, work of circulating area is also in progress along with other beautification work of the station building. 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






37 SWR Mysore Mysore Improvements to facade, second entry, circulating area, Waiting rooms etc., at Mysuru station. 8 29.08.18 & 05.11.18 LOA issued for 03 works. balance tenders are under finalisation Consultant finalised. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






38 WR Ahmedabad Ahmedabad Ahmedabad(BG)-Redevelopment of Ahmedabad station. 3 9.8.18 (Civil) 25.8.18 (Electrical) 16.8.18 (S&T) - Tender finalized on 06.10.18. Work in progress. - - 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






39 WR Ratlam Ratlam Ratlam: Redevelopment of station 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






40 NFR Tinsukia Tinsukia New Tinsukia - Redevelopment of station - Soft Upgrades improvement at station. This work consists of following items: 1) Improvement to 2nd class waiting room. 2) Provision of seperate room for Station Superitendent. 3) Improvement to pay & use toilet. 4) Improvement to Station concourse area. 5) Improvement of RPF office in Station Platform. 6) Improvement and relocation of Parcel office. 7) Improvement of upper class waiting room and ladies upper class room. 8) Provision of food kiosks. 9) Improvement to PF-1 by granite flooring. 10) Provision of escalator at PF-1. 01 21.08.18 with date of opening 13.09.18 19.09.18 Beautification work is in progress. Improvement of 2nd class waiting room - work in progress. Seperate room for SS & CTI - work in progress. Pay & Use toilet - work in progress. Improvement of Station concourse area - work in progress. 15% The work awarded on 19.09.18. The agency has been preparing for taking up all the works to complete the work as per DOC (six months). 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






41 NFR Rangia Rangiya Jn. At Rangiya, Re-development of stations - Soft upgrades improvements at stations. This work consists of following items: 1) For the development of circulating area and protecting the Railway land, work for construction of boundary wall. 2) For development of parking area, dismantling of work of all non desired pathway and structure. 3) The dismantling work of Station Building, which required for the improvement of facade of station building. 4) Dismantling work of old/abandoned officer rest room at 1st floor. Work of renovation of this space into wifi lounge is in progress. 5) Development of circulating area and parking area. 6) Work for the improvement of Station Building facade. 7) Work of new 4.8 m wide FOB at GHY END. 8) Provision of escalators 1 no. and lifts 2 nos. 9) Boundary wall on west side raised approx 200 m in length. 10) Shuttering work for facade improvement. 11) Renovation in Station (internal). 03 i)22.07.2018 with date of opening 16.08.2018(Engg.), ii)27.08.2018 With date of opening 01.10.2018(S & T) & iii)17.07.2018 with date of opening 23.08.2018(Elec.). i)27.08.2018, ii)Tender awarded, iii) 18.09.2018. The item of work for improvement in progress - i) Improvement of circulating area, Construction of boundary wall, development of parking area, ii) Facade improvement. iii)Concourse improvement iv)Washable apron, v) Renovation of Station (internal). 25% The work awarded on 27.08.2018 (Engg.). The agency has been taking up all the works such as improvement of facade,circulating area,excutive lounge etc. to complete the work as per DOC (31.12.2018). 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






42 NFR Katihar Siliguri Jn Siliguri Jn: Re-development of stations - Soft upgrades improvement at stations. This work consists of following items: 1) Work of improvement of landscape in front of main Station Building in circulating area. Dismantling of existing structures. 2) Development of parking, approach road. 3) Improvement of facade. 4) Improvement of drainage. 5) Improvement of Station Building. 6) Improvement of Platform Surface along with other ancillary and finishing works. 01 22.07.2018 with date of opening on 16.08.2018. 30.08.2018 Work of Improvement of landscape of main SB in circulating area, concourse, retiring rooms, waiting hall, lounge, platform surface,facade, parking, drainage, station building entry , exit...etc 12% The work awarded on 30.08.18. The agency has been taking up all the works to complete the work as per DOC (six months). 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






43 NR Delhi DELHI JN. 1. Renovation & widening of PF 16, VDC surfacing, second entry of station, relocation of FOB landing, landscaping, mural on circulating area wall. 2. Relocation of offices, exterior painting of station building with approved color scheme, re-vamping of TTE and Drivers running room. 3. Development of green path and landscaping at station. 4. Improvement to pathway to the road approaches & replacement of old bit matic flooring of PF no. 11, 12 with VDC. 4 25.05.2018 August 2018 Following works completed:- 1. Relocation of offices, CTI office and 5 shops. 2. CC flooring in Parking area. 3. Development of green parks in vicinity of DLI stations in yards and circulating areas with maintenance. 4. 8 mali deployment for entire horticulture work maintenance. 5. VDC flooring at PF 11. 6. Coping replacement of PF 11. 7. Pathway Bitumastic work work completed. 75% Target date for completion is 31.12.2018. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






44 WR Mumbai Central Valsad Valsad:- Redevelopment of valsad station. 2 27.7.18 (Civil) 6.8.18 (Electrical) - Tenders finalized on 08.10.18. Work in progress. - - 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






45 WR Rajkot Rajkot Redevelopment of Rajkot station. 3 17.8.18 (Civil,Electrical and S&T) - Tender for Civil, Electrical and S&T work is opened on 10.9.18 and awarded on 04.10.18.Work in progress. - - 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






46 NR Ambala Shimla 1. PF no. 1 & 2 Surface improvement. 2. Toilet Block Improvement at Shimla Station. 3.Ornamental Grill at Various locations. 4. Improvement of Kitchen and One residential room of ?Running Room? at Shimla. 5. Repair to heritage Façade of Shimla Station. 6. Extension of 2nd Class Waiting Hall & its Beautification. 7. Improvement of Toilet & Room of SS/Shimla & adjoining 2 rooms. 8. Metalizing/Painting of Steel Structures on PF no. 1 & 2. 9. Wooden Cladding around PF Shed Columns. 10. Apex painting of Shimla Station Buildings. 11. False Ceiling in Front of Booking Office & Improvement of Toilet in booking office. 12. Provision of Factory made precast covers on Signal rodding between line no. 1 & 2. 13. Improvement of Ramp at Shimla 14. Repair of Baba Bhalkhu Museum Gate. Following works completed:- 1. Repair of Baba Bhalkhu Museum Gate. 30% Work is progress and target date of completion is 31.12.2018. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






47 NWR Ajmer Udaipur City 1) Provision of Escalator at PF No 1, 2) Provision of Lift at PF No 2&3, 3) Improvement to waiting hall, 4) Improvement to approach road in circulating area, 5) Development of parking, 6) Udaipur - Improvement to front wall of station building, 7) Provision of FOB, 8) Improvement of Façade of the station building (30.00), 9) Standard signage, 10) Small shed over walkway, 11) Improvement in platform surface and facilities for disabled persons, 12) Toilets on ends and middle of PF 1,2,3,4,5, 13) Improvement to SS office, 14) Led lightning on Façade, 15) Augmentation of Electric supply, 16) Provision of lift, 17) Augmentation of back up supply, 18) Charging points for mobile phones, 19) Station map indicating the available facilities at NSG 1 & NSG 2 stations, 20) Construction of Entry Exit gate on main road, 21) E-Jan Suvidha (12 locations), 22) Extension of PF shelter on PF-1,2,3 5) to 7)= Tenders invited 5) to 7)= Works awarded, TDC-Dec.-18 to March-19 1) to 4)= Works Completed, 5) to 7)= Work in progress 1) to 4)= Works completed, 5) to 7)= Work in progress, 8) to 22)= These works are being sanctioned in CAP under Umbrella work as funds provided by Rly. Bd. For station redevelopment works. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






48 NWR Bikaner Bikaner 1) Improvement of Façade of station building, 2) Washable apron on PF no. 4, 5 & 6, 3)Improvement to Bikaner station building, 4) Improvement to circulating area , 5) Platform surface Vaccum Dewatered Concrete, 6) Systematic collection and removable of garbage, 7) Improvement to waiting halls, waiting rooms, Retiring rooms. Improved toilet facilities, drinking water arrangement etc., 8) Paid executive lounge at NSG1 / NSG2 stations, 9) Improvement to SS/SM/Dy.SS rooms, 10) Stainless steel benches, 11) Modular catering kiosks, 12) Provision of boundary walls /fences, 13) LED lighting, 14) Provision of tactile tiles, standard modular signages etc for Divyangjan, 15) Station map indicating the available facilities at NSG 1 & NSG2 stations 4 - - 1) = Estiamte under account vetting, 2)= Estimate sanctioned, 3)= Consultancy work is in progress 0% 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






49 NWR Jaipur Jaipur 1) Development of entry/exist gate pillars, station name boards, 2) Landscaping of circulating area, 3) Re-organization of parking, 4) Modular water foundation of SS, 5) Open waiting hall is to be developed, 6) Improvement of Façade of PRS and second entry booking office building, 7) Extension of Jaipur style line work to complete building, 8) Skywalk & Pathway from exist near PF no. 6 & 7 to bus stand, 9) Improvement of PRS building, 10) Improvement of flooring and upgradation of furniture N.A. 1) to 5)= Work completed, 6) 20.11.18, 7) 05.11.18, 8) 31.12.18, 9) 30.11.18, 10) 30.11.18 1) to 5)= Work completed, 6) to 10)= Work is in progress 5) Work of Open waiting hall completed but will become functional after completion of JP yard remodelling work, 6) to 10)= Work was held up due to non availability of funds in DF under PH 53. Now work is being shifted to alloc CAP. Ongoing work for JP station improvement under PB jointly funded by Ministry of Railways and Tourism is to be charged to CAP by changing allocation from DF for Railway funding. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






50 NWR Jodhpur Jodhpur 1) Washable apron to improve sanitation, 2) Provision of widening of FOBs including lifts and escalators (i)Provision of third FOB, (ii)Provision of escalator at second entry, 3) Improvement to circulating areas, 4) Platform surface to be Vacuum Dewatered Concrete, 5) Systematic collection and removable of garbage, 6) Improvement to exiting waiting halls, waiting rooms, Retiring rooms. Improved toilet facilities, drinking water arrangement etc., 7) Provision of coach guidance system, Digital clocks as per RDSO specification at P/F no. 4 & 5, 8) Improvement to SS/SM/Dy. SS rooms, 9) Improvement to booking areas & entry concourse, 10) Provision of stainless steel benches, 11) Provision of boundary walls/fences, 12) Provision of tactile tiles, standard modular signage?s etc for Divyangjan, 13) Station map indicating the available facilities at NSG 1 & NSG 2 stations (1) contract awarded, (2) (i) Work sanctioned, (ii) Work completed & under commissioning 3) to 13)= These works are being sanctioned in CAP under Umbrella work as funds provided by Rly. Bd. For station redevelopment works. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






51 SECR Nagpur Rajnandgaon Soft upgradation of Rajnandgaon station. 1. Conversion of existing goods shed into passenger platform. 2. Provision of second entrance on South side and development of circulating area. 3. New Platform on south side with shelter. 4. New station building on South side. 5. New FOB 6 mtr. wide. 6. Development of circulating area on South side. 7. Façade Development including main entrance with High Dome type shelter. 8. Provision of additional PF shelters, Stainless steel chairs, PF Surfacing, and additional passenger Amenities for New PF on south side. Completed works :- 1. 14 bays PF shelters. 2. Mist cooling at PF-1,2 & 3. Renovated Second class waiting hall. 4. Local art on Wall painting. 5. Lift at PF-1,2 & 3. 6. New urinal block at PF 1, Renovatoin of water booths & 15 nos. new benches . Tender awarded. 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






52 SECR Bilaspur Bilaspur Jn Soft upgrade of Bilaspur station. 1. Shifting of parcel office behind RMS. 2. Extension of NGP end FOB PF 2/3 to PF 1 . 3. Extension of 20? HWH end FOB PF4/5 to south side. 4. Strengthening existing FOB (HWH end). 5. Quick watering. 6. Extension of 20'''''''' FOB PF 2/3 to PF 4/5 (HWH end). 7. Single point valve operation system. 8. Platform surface, Steel dustbins at suitable location, Station maps near 4 nos Entry/Exit gates. 9. Development of 2nd entry on Loco colony side. Work completed:- 1. Replacement of damaged AC sheet with GI sheet at FOBs & PF Shelters. 2. Divyang toilets at PF 1A/6, 2/3, 4/5 & 7/8. 3. Renovation of UTS booking office. 4. Parcel cages at PF 1, 2/3, 4/5 & 7/8. 5. RPF command control room for CCTV cameras Integrated Security System. 6. RO water plant. 7. Computerized reservation charts. Works for total cost of Rs. 1.75 Crores completed. 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






53 SECR Raipur Raipur Soft upgrade of Raipur station. 1. FOB (6.0 m) with ramp, lift & escalator. 2. Line no. 7 extension with full length PF and amenities.. 3. Quick watering arrangements. 4. Upgradation of waiting hall . 5. Construction of one booking office . 6. 70 modular kiosks, 450 stainless steel benches, signages, indication boards, and other misce. Passenger amenity items. . 7. 90 mtr kota surfacing in platform no 2 & 3 in bilaspur end. 8. Improvement to façade of the station building. 9. Improvement to circulating areas duly streamlining the traffic flow. 10. Lounge with refreshment room, male & female toilet proposed. 11. Dismantling of Hanuman Temple in Circulating area for better traffic movement and traffic control, Express way of Phaphadih side, Platform development with shed, FOB ornamentation, parking facility on right side of the main station & Gudhiyari side RUB development and Boundary wall. Works completed:- 1. Part improvement of circulating area on south side. 2. Solar power panel . 3. RO water plant . 4. Spur line adjacent to line no.6. 5. New lift on exsiting FOB . 6. Divyang friendly toilet at each PF. 7. Digitalization of Reservation charts. 8. TV display sysytem with NTES connetivity for train arivial / Departure . 9. Escalator on South side and Gudiyari side. 10. Water Recycling plant . 11. Inproment of PF surface at PF 1,2 & 3. 12. Renovation & remodeling of VIP rooms. 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






54 SER Adra Adra Redevelopment of Adra Station (Phase -I). 1 18.09.2018 i) Beautification of RRI Cabin on PF No. 1 & 2 has been done by providing murals. ii) Replacement of old dilapidated ACC sheets have been carried out by providing galvalume sheets interlaced with semi- transparent poly- carbonate sheets. iii) Beautification of 1st class ladies waiting by providing murals on inside walls. iv) New 13 bays RDSO sheds have been provided on PF No. 3 & 4. v) Addition 02 Nos. toilet for Divyangjan almost all completed. 25% Work is in progress. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






55 SER Chakradharpur Jharsuguda 1.Jharsuguda - Platform shelter 5 bay (PF 4/5). 2.Improvement of PF surface of PF no.2/3 and 4/5 at Jharsuguda. 5. Provision of Ballastless track on platform no.1 of Jharsuguda station. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






56 SER Ranchi Ranchi Phase I: Development of circulating area , improvement of station building façade including façade lighting , renovation of concourse area and false ceiling on platform no. 1, construction of second entry with booing office and extension of FOB. Phase II: Shifting of parcel office , extension of upper class waiting hall and provision of cafeteria . Phase III: Resurfacing of PF no. 4 & 5, raising of PF no. 1 & 1A , extension of FOB up to rickshaw stand , construction of washable apron on line no. 1A 3 08-08-2018(one tender for phase-I). tender awarded on 05-10-2018(Phase-I). Conceptual plan is approved by railway board,consultant has been appointed, detailed estimate has been sanctioned, tender awarded on 05-10-2018. 5% work is in progress for development of circulating area and façade improvement of station building. 16/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






57 SR Chennai Chennai egmore Redevelopment of Chennai Egmore Station (NSG1)-Improvements to passenger amenities. 13 04.07.2018 Under Finalisation. Under this scheme, 15 tenders have to be invited. Out of which, two tenders were called and opened on 06.08.18 which is under finalization. Two estimates have been sent to Accounts. 5% 1)Replacement of coping slab and provision of granite surface have been completed at PF.3 and the work is in progress at PF.4 with TDC 15.09.2018. 2)Provision of 120 Nos of Steel Benches done on 15.06.2018. 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






58 SR Palakkad Palakkad jn. Redevelopment of PGT station with provision of aesthetic structure, landscape, sculpture, ornamental paintings, PF shelters & resurfacing etc. 3 -- -- Estimate under process. -- Tenders will be called by 2nd week of September''''''''18 pending Estimate sanction. 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






59 SR Trichchirappalli Tiruchchirappalli jn Redevelopment of station 9 -- -- Estimate under preparation -- Tender will be called by 2nd week of September''''''''18 pending Estimate sanction. 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






60 SR Madurai Madurai jn Upgradation of Madurai railway station. 2 17.08.2018 -- Plan/scheme finalized. Tender invited. Date of tender opening:31.08.18, TDC:31.12.2018. Façade Improvements taken up already. 10% The development / upgradation of Madurai Station is taken up under the sanctioned work of Joint Development with Ministry of Tourism. Hence, the proposed scope not included under Umbrella Sanction. 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






61 WCR Jabalpur JABALPUR Improvement of Facade of Stn. building, Circulating area of PF1 & PF6, PF surface on PF 1, 2/3, 4/5 & 6, Existing waiting hall toilet & facilities for divyang, SS/Sm/Dy SS Rooms, Booking area, Provision of Cover shed at Drop & Go of PF1 & PF6, Boundary wall, Tactile tile, Selfie & Meeting points, development of garden greenery, Steel benches at all PFs, concourse hall & all waiting rooms, PF1 (ET end) FOB ramp out side circulating area, Electrical works, LED lighting, water coolers etc., Telecommunication & passenger information works etc.& Replacement of broken Kota. Work identified & approved. Architect report approved. Tender schedule under preparation. Selfie point, Meeting point & Fountain have been developed. Tender schedule under preparation. Selfie point, Meeting point & Fountain have been developed. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






62 WCR Bhopal ITARSI Provision of new PF -1, Widening of PF 2/3, including carriage watering, Improvement of façade of station building, circulating area, PF surface, waiting halls, seating arrangement. provision of lift/ escalators. Work identified & approved. Consultant identified. Agreement under finalization. Consultant identified. Agreement under finalization. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






63 WCR Bhopal BHOPAL Improvement to facade, Circulating area, Vehicular traffic & lighting of station building towards PF1, Platform surface, coping, seating arrangements on various PFs, Provision of New FOB 5 m wide towards HBJ end and sky walk connecting new & old FOB, Escalators & Lifts on various PFs & station building, 10 line true colour outdoor LED dislay Boards outside station building on PF no. 1 & 6, Air conditioning paid lounge, Higher class waiting hall, Facade light at newly constructed 2nd entry building. Work identified & approved. Two packets tender opened on 05.10.2018. Tender under finalization. Work identified & approved. Two packets tender opened on 05.10.2018. Tender under finalization. 19/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






64 WR Bhavnagar Bhavnagar Terminus Bhavnagar Terminus: Redevelopment of station 2 10.8.18 (Civil) 16.8.18 (Electrical) - Tender finalized on 19.09.18 Work in progress - - 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






65 WR Vadodara Vadodara Vadodara:-Redevelopment of Railway station. 3 13.8.18 (Civil, Electrical & S&T) - Tender for Civil work is opened on 07.09.18. and awarded on 28.9.18 Electrical Work: Tender under TC. S&T Work: Tender to be opened on 30.11.18 - - 17/11/2018
FileBeforeAfter
Circulating   

  
  

  
Station Building   

  
  

  
Platform   

  
  

  
  

  






Total Records are: 65 Total Visitors are: 2016